Snagging After Completion: Can You Still Get a Survey Once You’ve Moved In?

Snagging After Completion: Can You Still Get a Survey Once You’ve Moved In?

You completed on your new build, moved in, and now you are finding things that should not be there. A door that will not close properly. Cracked grout in the bathroom. A boiler that trips the electrics. You are wondering whether you missed your chance to snag before completion — and whether anything can still be done.

The answer is yes. Snagging after completion is not only possible, it is often more thorough than a pre-completion inspection. This guide explains what post-completion snagging covers, when you can still act, what your developer is responsible for, and why a professional snagging survey after moving in can still save you significant money and frustration.

Quick answer: You can snag after completion. Most new build warranties require developers to fix genuine defects reported within 2 years of completion. A professional post-completion snagging survey gives you a documented, independent list of defects — which carries far more weight with a developer than a list you compiled yourself.

What Is Post-Completion Snagging?

Snagging is the process of identifying defects — workmanship issues, unfinished details, faults in materials or fixtures — in a newly built property. Pre-completion snagging happens before you legally complete and receive keys, ideally with a professional inspector walking through the property with a defects list.

Post-completion snagging is exactly the same process, carried out after you have moved in. It is not a lesser version — in some ways it is more thorough, because you can now test everything: every plug socket, every tap, every door, every window, under real living conditions. Some defects only become apparent once a property is occupied and heating is running through the system.

A post-completion survey from a qualified surveyor documents every defect with photographs, location references, and descriptions — creating a formal record that you can submit to your developer and, if necessary, use to escalate a complaint.

When Can You Still Snag After Moving In?

The short answer: within your warranty period, typically up to 2 years for most defects.

The first 2 years: developer’s responsibility

For the first two years after completion, your developer is contractually obliged to fix defects caused by their workmanship or materials. This is not a courtesy — it is a requirement under most new build warranty schemes (NHBC Buildmark being the most common).

Importantly, “defect” means something that deviates from the building standards and specification the property was built to. It does not mean normal wear and tear, cosmetic deterioration, or damage you have caused.

There is no single deadline for reporting

Some buyers assume there is a fixed point — usually just before the 2-year mark — by which all defects must be reported. In reality, you can submit defects reports at any time within the warranty period. What matters is that you report promptly once you discover an issue, and that you have documentation to show when the defect was first noticed.

Years 3–10: structural warranty

From year 3 to year 10, most NHBC and equivalent warranties cover major structural defects only. These include issues with foundations, load-bearing walls, roofs, and floors. Smaller defects — uneven plastering, stiff doors, cracked caulking — are no longer covered once the 2-year defects period expires.

Key point: If you are approaching the 2-year anniversary of your completion date, act now. Get a professional snagging survey done and submit all identified defects in writing before the defects period closes. Issues you miss now will become your cost to fix.

What the NHBC Warranty Covers (and What It Does Not)

The NHBC Buildmark warranty is the most widely used new build warranty in the UK. Understanding what it does and does not cover helps you set expectations when dealing with your developer.

Period What Is Covered What Is Not Covered
Years 1–2 (Defects Period) Workmanship defects, non-compliant materials, items not built to agreed specification Normal wear and tear, damage caused by occupier, cosmetic deterioration
Years 3–10 (Structural Warranty) Major structural defects: foundations, load-bearing walls, roof structure, floors Non-structural defects, finishes, services, fixtures and fittings
All periods Emergency situations that make the property uninhabitable (with conditions) General maintenance items, condensation (unless caused by a defect)

Not all new builds have NHBC cover. Some developers use alternative warranty providers such as LABC Warranty, Premier Guarantee, or Build-Zone. The principle is similar across providers, but the specific terms can vary. Check your title documents for your warranty certificate and provider details.

Common Defects Found in Post-Completion Snagging Surveys

New build properties vary widely in quality, but certain defects appear repeatedly in post-completion surveys. Knowing what to look for helps you identify issues that are genuinely the developer’s responsibility.

Internal defects

  • Cracked or uneven plasterwork on walls and ceilings
  • Doors and windows that stick, do not seal properly, or have misaligned hinges
  • Gaps and cracking around skirtings, architraves, and window surrounds
  • Poorly fitted kitchen units, drawers, or appliances that are not level
  • Bathroom tiles with hollow spots, loose grout, or cracked adhesive
  • Electrical sockets or switches that are not flush or properly secured
  • Inadequate ventilation in bathrooms or kitchens leading to condensation

Heating, plumbing, and services

  • Noisy pipes, unbalanced radiators, or heating zones that do not respond correctly
  • Hot water that runs cold intermittently or takes too long to reach temperature
  • Taps or showers with poor pressure or slow drainage
  • Boiler faults, error codes, or repeated pressure drops
  • Extractor fans that are noisy, underpowered, or incorrectly ducted

External defects

  • Cracked render, gaps in pointing, or damaged brickwork
  • Flat areas on driveways or pathways that allow water to pool near the property
  • Poorly fitted or misaligned gutters and downpipes
  • Gates or fences that are not properly installed or secured
  • Uneven landscaping or inadequate drainage in gardens

How to Report Snagging to Your Developer After Completion

Reporting defects effectively — and in a way that creates a clear paper trail — gives you the best chance of getting them fixed promptly and without dispute.

Report in writing, always

Do not rely on verbal conversations with site managers or customer care representatives. Submit all defect reports in writing via email or the developer’s formal customer care portal. This creates a timestamped record of when the defect was first reported, which matters if the developer disputes responsibility later.

Be specific and use photographs

Vague reports like “there are cracks in the plaster” are easy for developers to deprioritise. Specific reports with photographs, room locations, and descriptions of the defect are harder to ignore and easier for the developer’s contractor to action without a site visit.

Use the warranty provider if the developer is unresponsive

If your developer fails to acknowledge your defects report or refuses to repair legitimate issues within a reasonable time, you can escalate to your warranty provider. For NHBC properties, their Resolution Service helps mediate disputes between homeowners and developers during the defects period.

Keep a defects log

Note the date you first noticed each defect, the date you reported it, and the developer’s response and promised repair date. If issues recur or the developer cancels appointments repeatedly, this log supports any escalation.

Do You Need a Professional Snagging Survey After Moving In?

You can absolutely compile a snagging list yourself. Many new build buyers do. But there are clear advantages to having an independent professional carry out a post-completion survey.

A professional identifies what you miss

A trained surveyor will check areas and systems that most homeowners overlook: roof ventilation, drainage falls, boiler flue positioning, fire door compliance, structural settlement patterns, and the condition of components above ceiling height. These issues may not present obvious symptoms for months.

An independent report carries more weight

Developers take professional reports seriously in a way they do not always extend to buyer-compiled lists. A formal document from a qualified surveyor — with photographs, descriptions, and references to building standards — is much harder to dispute or delay.

It provides a record for the future

If disputes escalate, or if you later sell the property and issues are raised in a buyer’s survey, having a documented professional snagging report from shortly after completion gives you evidence of the property’s condition and the developer’s obligations.

Our post-completion snagging surveys are available across Peterborough, Cambridgeshire, Corby, Rutland, and the surrounding area. We produce a clear defects report you can use immediately with your developer.

Moved into a new build and finding problems? Our post-completion snagging surveys give you a documented, professional defects report to use with your developer — before your 2-year warranty window closes.

Frequently Asked Questions

Is it too late to snag if I moved in 6 months ago?

No. You have until the end of your warranty’s defects period (typically 2 years from legal completion) to report workmanship defects. Six months in, you have plenty of time — but do not delay if you have noticed issues, as documentation of when defects were first spotted does matter.

My developer says the cracks are normal settlement — are they right?

Some hairline cracking at corners and joints is normal as a new build settles. However, wider cracks, stepped cracking, or cracking that progresses over time may indicate a genuine defect. A surveyor can distinguish between cosmetic settlement cracking and structural or workmanship issues.

Can I use my snagging report to negotiate a refund instead of repairs?

In most cases, warranty schemes require the developer to remedy defects in kind — by carrying out repairs — rather than offering cash compensation. If the developer is unresponsive or the repairs are inadequate, the warranty provider or legal action may be routes to financial remedy, but this is less common.

What if I did not have a pre-completion inspection?

You have not missed your opportunity. A post-completion snagging survey is arguably more valuable in some ways, as you can test every system under real conditions. The absence of a pre-completion report does not affect your warranty rights.

How long should snagging repairs take?

There is no fixed statutory deadline, but the Consumer Code for New Homes and NHBC guidance suggest developers should respond to defects reports within a reasonable timeframe — typically acknowledging within 5–10 working days and scheduling repairs within 4–8 weeks for non-urgent items. Emergency defects should be addressed faster.

What is the difference between a snagging survey and a structural survey on a new build?

A snagging survey focuses on workmanship defects, finish quality, and compliance with specification — typical new build issues. A structural survey (Level 3) looks at the structural integrity of the building in greater depth. For most new builds within warranty, a snagging survey is the appropriate product.

Can I get a snagging survey done on a resale property that was originally new build?

A standard snagging survey is most relevant in the warranty period. For a resale property that was previously a new build, a Level 2 or Level 3 RICS survey is more appropriate. If the property is still within its structural warranty period, that warranty may transfer to the new owner — check the warranty certificate carefully.








Featured Posts

Related Posts

Related surveys

Level 2 – Homebuyer Survey

Ideal for modern homes or flats. Highlights urgent issues and major repairs before you buy.

Level 3 – Building Survey

A full structural review for older or altered properties. Detailed analysis of condition, defects, and repair options.

Pre-Completion Inspections 

Spot unfinished work and defects before you get the keys. Essential for protecting your investment on a new build.

Post-Completion Survey

Already moved in? We’ll help you identify problems early so you can raise issues with your builder or warranty provider.

Share This Article:

0 Comments

Submit a Comment

Your email address will not be published. Required fields are marked *

Secret Link